Monday, 26 September 2016

Toronto CanBIM Regional Session & Technology Exhibition


I have managed to secure a special discount for colleagues and clients for the Toronto CanBIM Regional Session & Technology Exhibition: Technology Built Innovation II. 

Please take advantage of this reduced rate courtesy of CanBIM. 
See Registration instructions below.  


Guest Discount Registration Instructions
Guest Discount Code (10% discount): BIMTOR12NCM
Select "Non-Member" Registration Category 


October 5th & 6th, 2016

Metro Toronto Convention Centre
255 Front Street West
Rooms 205-206
Toronto, Ontario M5V 2W6
Canada
(416) 585-8310

Technology Built Innovation II 
CanBIM’s 2nd Annual Technology Built Innovation is jam packed with activity!! 

On Day One (October 5th), we start things off with a Tour of the EllisDon project site for the York University Subway Station and a Tour of the Award Winning Bergeron Centre for Engineering Excellence at York University. Next, The CanBIM AGM, and then we close out the night with a big splash at the Autodesk Opening Reception which includes the 2nd Annual CanBIM Awards. Our 2016 CanBIM Award Nominees have been selected see below for more information on this years candidates!
​
On Day Two (October 6th) We will host industry presentations and demonstrations on innovative and emerging BIM workflows, methodologies and technologies from industry leaders in the Architectural, Engineering, Construction and Facility Management fields. Right next door to our main presentations is our Technology Exhibition, which hosts 20 cutting edge companies showcasing their latest innovations! 

All disciplines and decision-makers are encouraged to attend this annual technology focused event.  One registration covers entry to both days; you won’t want to miss this event!

Tuesday, 9 August 2016

Exporter tool by RTV Tools

I dont often promote a Revit add-in or specific tool, mainly because I need to try them out and form my own opinion first before writing a posting promoting the product. 
I also dont want to appear biased, but when I come across a product or service that stands out I feel obliged to share my opinion!

Recently we've been looking for a specific tool to help us automate the creation of PDF's, DWG and a variety of other outputs for a large project. I looked into a number of applications and decided to try out RTV Tools, Xporter pro.

I love it!

Not only the application but also the service and support from RTV Tools. these guys have been great at providing support, training and solutions to our needs on this project.

Some of the specific tools weve been looking at and now using are scheduled tasks such as exporting, print to PDF, all remote task processing.
Some additional features include:

  • Bulk Sheet edit parameter data;
  • Import and Create Sheets from Excel;
  • Bulk update Sheet Revisions and export Revision and Cloud data to Excel;
  • Batch File Upgrader including Family, Project and Template files.
If your looking for a great Revit add-in tool check these guys out. 
I've been impressed in their service and the tools they provide.

Friday, 8 July 2016

RTC NA 2016

I'm off to the North american Revit Technology Conference next week held in Phoenix Arizona!
Going to be HOT!

If you're going feel free to seek me out and say hi, I have a session called:

In the Face of a Challenge
Innovative Project Delivery Strategies

Building and Integrated Team to Deliver a Project

This session is all about how project team management and planning is crucial as projects become more complex with tighter budgets and compressed timelines. 
I'll discuss the unique processes and procedures to address a variety of challenges on large, complex building projects. Using as a case study the Vancouver-based BC Children's and Women's Hospital, a $680 million project delivered by public-private partnership.

Hope to see you there!
Sc

Wednesday, 29 June 2016

How to Manage a Meeting

Managing a meeting is a very important skills.

Meetings can either be a huge drain on time and resources or a huge benefit to both those involved and the organization as a whole. If you are reluctant to attend regular scheduled meetings, or feel they are a waste of time the meeting is likely not being run effectively.

How effective a meeting is can depend upon who, and how the meeting is managed. The benefits of a well run meeting can be priceless, whether it be a short 10 min meeting or a  multi day summit, you want people to walk away from a meeting with the feeling of accomplishment and a sense of time spent.

If you are the organizer of a meeting, you are basically demanding an investment of time and knowledge from your participants, whether they are from within your organization or outside your organization there is a significant investment in cost and resources associated with holding a meeting. 
The time spent during this gathering can be an invaluable investment that will have a positive impact on your project.

I’ve attended many meetings… meetings dealing with complex issues that have brought together people from around the world with considerable investment in time and money. I’ve been fortunate to observe a number of very well organised people who are able to run a well thought out, successful meeting.

Taya Photography

Here is an amalgamation of tips and notes I’ve gathered from observing how successful meetings is organized.

Why: Firstly why are you having a meeting, is it absolutely necessary?
Consider the return on investment and what alternate options do you have to deal with the issues. If the meeting is just to inform take a look at other mediums that can be use to share the information, such as email, posting on a project forum, chat room or website. There are a number of great online platforms that allow for collaboration and sharing of documents and information where multiple people can add their thoughts and comments at their convenience.

Who: Who needs to attend?
Consider each individual's involvement on the issues and their ability to address or participate in finding solutions. Only involve those who are able to provide solutions, select people who have the ability to communicate effectively, avoid inviting people who are typically reluctant to contribute or who are dogmatic in their opinion, you want to create an environment of collaboration and solutions. 

Agenda: Have a well organised agenda that covers the topics needed to be discussed during the meeting. This means doing some preparation, find out prior to the meeting what the issues are which will define your objectives. From this you will be in a better position to invite the right people to the meeting in an effort to find the best possible solutions.

Stick to the agenda… but, don’t be afraid to veer off track to address issues that may arise. A good way to manage any "side" issues that come up  is to place them in a “cage” which can be addressed later allowing you to get back on the immediate topic. A “cage” is an area on a whiteboard or flip chart where you can list topics that need to be addressed at the end of a meeting. Before the end of a meeting these “caged” items should be assigned to an individual who can briefly give a 10 minute summary addressing exactly what the issue is and what possible solutions may be available, if no solutions are available this then becomes a action item delegating responsibility.

Meeting Summary: After the meeting, go over the objectives and outcome of the meeting, recognise people’s contributions and their participation. Summarize the challenges, solutions, plans and resolutions that have been addressed and those that require additional attention. Keep it simple, concise and brief. (something I find challenging...)

Action Items: Delegate responsibility of items that need to be addressed resulting from the meeting. You may have run a productive meeting but if there are no action items resulting from the meeting issues may not get resolved outside of the board room. Assign action items to those who are best suited to deal with the item as action items will hold people accountable.
                                
Hope these tips help you manage your next meeting. Whether it's between two people or twenty, I have found these tips invaluable in holding a productive meeting.

Monday, 27 June 2016

Keeping up with Technology

When transitioning to Building Information Modeling you will have people who resist the transition, the prospect of having to learn new software, a new process and the disruption that the transition to BIM will be their main excuses not to move forward.

Technology has had an impact on a number of industries. Design and Construction is no exception, we need to constantly adapt and keep current if we want to remain in the industry, or you’ll become obsolete like these services we all use to use.. 

Remember getting your film developed? 
Use to be exciting to go pick up your photos, going through them for the first time, seeing which ones turned out and which ones didn’t. Often seeing photos you took months ago…



Going to get a movie… for me that was an evening out!
Going to the video store to pick a movie to watch that evening was fun…. 
Look at how fast Blockbusters disappeared!



Going to the store to buy music on a Compact Disc (or cassette), browsing through the available CD’s looking at what your favorite artist had recently released. Taking it home to play on your CD player… (Alternately substitute the word Compact Disc for Vinyl Record).



There are many examples I could refer too including, Fax Machines, VCR’s, PDA’s, pay phones, newspapers, parking your car, Taxi’s, Cable TV…etc, etc…

“Industry” in general is changing and as technology advances at an ever increasing rate, so too will the Design and Construction Industry. Which means we have to adapt now! Not only adapt our software but adapt our processes and the whole culture around design collaboration and our traditional deliverables. Changing “tradition” is the challenge, I’d be quite happy eliminating printed drawings tomorrow if I could, but it’s part of our contractual obligations, even though the BIM has far greater information that the printed set of drawings ever will.

When transitioning to a new process that utilizes technology keep in mind the long term goals of efficiency, productivity, sustainability and longevity. Resist the urge to go back to the “traditional” process or only “dipping your toe in” to test the waters, you need to move forward with a detailed plan and with confidence. There will always be hurdles and bumps in the road, keep the goal in mind and don’t turn back, it’s the only way you’ll be able to achieve your goals.

You don’t need to be on the cutting edge, but you also have to be careful not to end up on the “cutting room floor”, take advantage of the technology and make it work for you, introduce aspects gradually and build upon existing skills and knowledge. Through an incremental approach you’ll be surprised at how quickly people adapt and adopt technology, pretty soon you’ll be walking your client through a Virtual Building Model. Technology will allow you to deliver a better product faster than ever before by simply utilizing Building Information Modeling and the available associated technology that is rapidly being developed.


BIM is just a tool... And tools are what we use to amplify our capabilities.

Thursday, 26 May 2016

From CAD Manager to CIO

"CIO...? What's that?" I hear you say.

Chief Information Officer.. I like that title... so much better than BIM Manager don't you think!

Many of us have made that transition from CAD Manager to BIM Manager, many of us are finding that the role of BIM manager is growing beyond the scope of managing the project Building Information Model and more involved in the operational aspects of the business.

The transition from traditional 2D CAD to 3D BIM is probably more complex than we ever imagined. It's impact on the overall design and construction process is EPIC... yes I said Epic!

It affects not only how we produce our printed drawings (ugh..until the model supersedes flat printed drawings!) but also the business of design and our flow of operations involving everyone from the VP's to the tech's.

And who's on the front lines.... the BIM Manager! (in my opinion).

Robert Green, yes you know him from his CAD Manager blog, or Cadlyst articles or have had the opportunity to be in one of his session at numerous conferences, has recently writen an article specific to this topic on the new CAD Managers Center site. 
Very insightful!

Read his article here: http://cadmanager.autodesk.com/competitive-advantage/how-to-advance-from-cad-manager-to-cio/

Also check out the resources available on the CAD Managers Center site. Worth checking out and bookmarking.

Are you a CIO in the making? 
Your firm or office may not even know that they need a CIO, just like they didn't know they needed a BIM Manager until it became apparent. 

Great advice I've followed for most of my career, "Take on the Role that you Aspire too".

Sc.

Thursday, 12 May 2016

The 8 Worst Things You Can Do In Revit

The 8 Worst Things You Can Do In Revit

1. Never leave inserted AutoCAD DWGs in a Revit model. Although you can insert a block or drawing into Revit it can cause severe performance and stability issues. DWG files bloat the model by using far more memory than pure Revit entities. If the AutoCAD file is necessary as a background, linking the file in rather than importing it can prevent and reduce some of these issues.

2. Don’t let unresolved Revit warnings languish. Large numbers of unresolved warnings can seriously degrade model performance and stability. Resolve warnings as they occur to keep them from building up in the model. Periodically check the “Warnings” tool on the “Manage” ribbon to see what warnings (if any) have built up in the model.

3. Don’t use Revit Families from Manufacturers without checking them first. Building Product Manufacturers are responding to your requests for Revit content by having families of their products created in Revit. These families may look great when viewed, but if they contain too much detail they can quickly bloat your model.

4. Don’t over-model. One of the most common mistakes among new users of Revit is to put too much detail in the model. Determine how much detail is really necessary to convey your design intent, and then monitor your team to prevent over-modeling.

5. Don’t use in-place families too often. While it is inevitable that you will have to use in-place families in a typical project, be selective in their use. If you create an in-place family and later decide that it should be a component family, there is absolutely no way to convert it. If you must use an in place family, do not duplicate it. For example, if you have to use in-place families to create light coves in several rooms, create them all in one in-place family; don’t create a different in-place family for each room. 

6. Don’t over-constrain model geometry in a project file. Dimension and alignment constraints add overhead to the file and increase the potential for the dreaded “constraints not satisfied” error message. If you’re not absolutely sure that you should constrain something, then you probably shouldn’t.

7. Don’t lose control of your views. Exercise good view management. Don’t create unnecessary views and don’t leave views unnamed. During the course of a project, the project browser can become populated with a large number of unnecessary views that add to file size.

8. Don’t over-use Groups. An inordinate number of groups in a project can impact performance and bloat the model. Make sure to purge unused groups from the model regularly and turn off the “Group and Associate” option when using the Array tool. 