How to use the Copy Monitor Tool
From the drop down you can
select either Use Current Project or Select Link.
The Current Project tool allows you to copy and monitor objects within
your project. You would use this when multiple people are working within the
one project.
The Select Link tool allows you to select objects from a linked file
and either copy the objects into your project and monitor them or monitor
existing project objects compared to objects in the linked file…
Here’s an example:
We have Structural Column
placement from our Structural Engineer.
Structural
Column Layout
The Structural file is
linked into our Architectural Model. My Architectural Model has Grids and
Architectural Columns Wrapping the Structural members.
Pick the Structural Link using
the Select Link tool, and then select
the Copy tool and then select the
Structural grids and Columns (check
Multiple).
After selection the objects
you want to copy monitor select the Finish
on the Option bar.
You can also modify the
Copy/Monitor Options and specify the settings for the type of elements.
When you have finished
selecting elements to copy into your project click the big green Finish check mark.
These elements are now part
of your project and you can manipulate them as required.
The original element remains
in the linked file but is watched within your project.
Some elements such as
openings and door and window openings are automatically copied with their
associated elements.
So… now if I open my
structural file and move the column and grid element, save the file and refresh
the link Revit recognizes that some elements have moved and will give me a
Warning. Select Ok.

Now that we know that objects have changed we now need to run Coordination Review selecting the linked file.
This will open up a Coordination Review dialog box.
You can Group the
information in a variety of combinations of: Status, Category and Rule. If you
can’t see anything in the list check each group type.
Also here, under Actions, you can specify how the copied
element will be treated: Postpone, Reject, Accept difference or Rename/Move/Modify…(basically,
move to new location).
You can also select the
element and click the Show button
which will highlight the changed object in your project. You can also generate
a HTML report if so required.
Sc.
Sc.









