Here are some basic Worksets to include at the start of any project.
Create the following Worksets .
- Shared Grids and Levels
- Project tracker
- Exterior Shell
- Interior
- Central Core
- Roof
- Parkade
- Structure (if applicable)
- Stairs
These are a good starting point and more can be added as the project and project team develops.
Send
detached Central file to consultants along with these recommended Worksets.
Consultants can then
open detached and “Save As” to create their own Central File.
All Consultants
All consultants should include the following Worksets, this way all parties involved can control the linked files consistently.
- Shared Levels and Grids
Each
BIM link should have its own Workset, ie:
- BIM – Architectural
- BIM – Structural
- BIM – Electrical
- BIM – HVAC
- BIM - Plumbing
Mechanical
- Ductwork (Supply and Return)
- Equipment
- Piping
- CAD Lines (If applicable)
- Fire Protection
Electrical
- Power
- Lighting
- Cable Trays
- Data
- CAD Files (If applicable)
- Equipment
Plumbing
- Fixtures
- Piping
- Drainage
- CAD Files (If applicable)
- Equipment
Sc ;-)